Able to finish the metal roof on the propane storage. The wind needs to tone it down a notch before I get back on the main roof. Oh and after 3 weeks of waiting the main power cord (#6-3 SOOW) has arrived so as soon as that's hooked up it's time to stop looking at all that insulation and see some pine tongue and groove!
|
Richard WrightI'll be posting pictures of the process of designing and building a tiny home. |